The Blame Game: Determining Responsibility for Project Delays

Bennett Jones
4500 Bankers Hall East
855 - 2nd Street SW
Calgary, T2P 4K7
Crédit de FPC
BJA CPD
Réseaux sociaux
Mode lecture
S'abonner
Résumer

While construction delays are common on most projects, allocating responsibility for these delays can be extremely difficult, particularly where multiple parties may be at fault.

Please join our construction solicitors and litigators as we address liability for concurrent delay, strategies for dealing with delay in the midst of a project, and drafting tips for addressing delay up front in the construction contract.

Infrastructure in 2025 Edmonton
Événement

Infrastructure en 2025 | Edmonton

11 février 2026
Infrastructure in 2025 Ontario
Événement

Infrastructure en 2025 | Ontario

10 février 2026
Infrastructure in 2025 Calgary
Événement

Infrastructure en 2025 | Calgary

3 février 2026 Bennett Jones Calgary, 4500 Bankers Hall East, 855 2e rue SO